Power & Data Centre
From one rack in a branch office to a containerised data centre. Sized to your load schedule, installed, commissioned under load, and maintained.


Survey and sizing
Load schedule, autonomy, redundancy and growth. We size to the next standard frame, not to the number that sells the biggest unit.
Supply
Equipment against the approved submittal, with datasheets and certificates the consultant will sign.
Installation
Positioning, battery racking, DC and AC termination, containment and integration with the switchboard.
Commissioning
Load bank testing, transfer verification, alarm proving, handover documentation and operator training.
Every class of UPS, from the desk to the data hall.
Single phase
| Class | Rating | Topology & format |
|---|---|---|
| Line interactive, tower | 400 VA – 3 kVA | Desks, tills, small comms cabinets |
| Line interactive, wide input | 600 VA – 3 kVA | Weak or generator-backed supply |
| Line interactive, pure sine | 1 – 2 kVA | For equipment with active PFC power supplies |
| Online double conversion, tower | 700 VA – 3 kVA | Full isolation from the incoming supply |
| Online double conversion, rack or tower | 3 – 11 kVA | Lead-acid or lithium battery |
| Online double conversion, rack-mount | 6 – 10 kVA | Up to 94% efficiency |
| Modular, rack or tower | 4 – 20 kVA | N+X redundancy inside one frame |
Three phase and modular
| Class | Rating | Notes |
|---|---|---|
| Online double conversion | 10 – 40 kVA | Up to 95.5% efficiency |
| Online double conversion | 50 – 200 kVA | Up to 95.8% efficiency |
| Modular, rack format | 10 – 50 kVA | Unity power factor |
| Modular subrack | 10 – 150 kVA | Up to 96% efficiency, unity power factor |
| Modular cabinet | 40 – 1000 kVA | Up to 96% efficiency, hot-swap power modules |
| Modular, high efficiency | 30 – 500 kVA | Up to 97% in double conversion; 380/400/415 V; VRLA, lithium or supercapacitor |
| Tower | 200 – 1200 kVA | Large data-centre class |
| Marine and offshore duty | 30 – 200 kVA | Built for shipboard and offshore installation |
Ratings shown are the published ranges of the series we supply in this region. Exact frame, efficiency class and battery configuration are confirmed on the quotation against your load schedule.
The part that fails first, and the part nobody budgets for.
A UPS is only as good as the string behind it. Lead-acid, gel, high-rate, deep-cycle and lithium — sized to the autonomy you need, with a replacement programme so it is changed before it fails.
| Type | Capacity | Volt |
|---|---|---|
| General purpose VRLA | 1.2 – 250 Ah | 2 V |
| High rate | 55 – 150 Ah | 12 V |
| Long duration cells | 100 – 3000 Ah | 2 V |
| Standby blocks | 36 – 200 Ah | 6 / 12 V |
Also supplied: deep cycle, high rate, gel and LiFePO4 lithium. Larger systems can be specified with VRLA, lithium-ion or supercapacitor storage, and with battery management that charges in stages to extend service life.
Power, cooling, containment and the rack it all sits in.
We deliver data-centre projects turnkey — design support, supply, installation, commissioning and handover — or supply any part of it against someone else's design.
Room cooling from 5 to 20 kW and from 25 to 300 kW, air-cooled or chilled water, plus in-row, rack-mounted and outdoor condenser formats.
Integrated power, distribution, battery, cooling, fire protection and cabinets — deployable where a conventional room is not practical.
Basic, metered, metered-outlet and switched, single and three phase, roughly 1.4 to 46 kW, 0U vertical or horizontal, cascadable up to 40 units.
IT racks rated to 500 kg dynamic load with cable management and baying kits, and power-management software for remote monitoring and graceful shutdown.
PDU platforms supplied carry UL 2900-1 and IEC 62443-4-2 cybersecurity certification, which is increasingly a requirement in Saudi data-centre tenders.
Size the system before you call us.
Indicative, not a substitute for a survey — but they get you to the right order of magnitude before the meeting.
Power factor 0.9 is a reasonable default for mixed IT and mechanical load. Modern modular UPS is unity power factor, so kVA and kW are the same number at the output.
Indicative sizing
Vertical cylindrical vessel with two identical ends. For a jacketed vessel the figure below is the inner product volume, not the jacket.